Baby, it’s cold outside (and inside!)

The cold weather slowed us down a little, cement in the front lobby was to be poured on Friday, Jan. 8, but to cold!  So today we see both the cement being poured and the new ceiling tiles being installed in the Auditorium!

DSCN1794

The Putzmeister is not being used since this is a ground level installation, I am a little disappointed but not much!

DSCN1796

DSCN1797

The small yellow machine packs the dirt down and is run by remote controll by the gentleman in the brown jacket!

DSCN1798

The beautiful new ceiling tiles are being installed, no more brown stains from a leaking roof!  Happy days are here again!!