The heat is on!

With the boiler up and running, workers finish installing the new ceiling tiles and the painters start the primer on the ceiling.DSCN1806

DSCN1809

Temporary doors are installed in two of the offices in the lower level, we should be moving into them by the end of next week

DSCN1807

Leave a Reply